In short. If your sign is bigger, taller or more unusual than a standard storefront sign, start with a conversation, not a form. Send photos, rough sizes and any drawings. We send back a drawing with a firm price in US dollars for your sign-off, and nothing is built until you approve it.
What counts as large or complex
- Pylon and monument signs. Freestanding signs at the road edge, including multi tenant signs for plazas and business parks.
- Building scale letters. Channel letters or logos sized to be read from a highway or across a parking lot.
- Blade and projecting signs. Double sided signs that stand out from the building face.
- 3D and sculptural pieces. Dimensional logos, shaped light boxes and one of a kind features.
- Sign packages. Every sign for a new building or rebrand: exterior identity, directional and wayfinding signs, tenant directories and plaques.
What to send
- Photos of the site, straight on if you can, with something for scale.
- Rough sizes or the space available, for example the fascia band height or the planter where a monument sign will sit.
- Drawings if you have them: architect or designer packages, site plans, elevations. PDF, DWG, DXF, AI and EPS files are all accepted.
- Your logo, ideally as a vector file.
- Any sign criteria from the landlord, property manager or shopping center, and the city or district.
How a complex sign project runs
- Brief. You send the files above. We ask what we need to price it properly.
- Drawing and firm price. We send a drawing with sizes, materials, lighting and mounting, and a firm price in US dollars. You approve it or ask for changes.
- Permits. We can handle the sign permit application. Larger signs often need more than a sign permit; see below.
- Fabrication. Built to the approved drawing. Complex custom work can take up to 3 months.
- Delivery and installation. One-stop service. We apply for the sign permit, professional engineers we work with in Washington State prepare stamped drawings when the city asks for them, and installation plus the electrical connection for lit signs, by a licensed electrician we have worked with in Washington State, are done in one visit. Each item is priced in your quote, and supply only is available.
Engineering and permits for big signs
The bigger the sign, the more the city usually wants to see. Large signs can need more than a sign permit, for example stamped engineering drawings or landlord approval. Professional engineers we work with in Washington State prepare stamped drawings when the city asks for them, and we flag what applies when we quote.
For architects, contractors and developers
If you are specifying signs for a project, send the sign drawings or the full package and we will price from it. Tell us the schedule and who approves the shop drawings, so the drawings and timeline can be planned around it.
Questions
How long does a large or complex sign take?
Simple signs take about 3 to 4 weeks. Complex custom projects can take up to 3 months, depending on design, engineering, permits and fabrication.
Can you handle the sign permit?
Yes. We can handle the sign permit application for you. Some cities also need a building permit or stamped engineering drawings for larger signs.
Do you install large signs?
Yes. Installation and the electrical connection, by a licensed electrician we work with in Washington State, are done in one visit and priced in your quote. You can also use your own contractor.
Can you price from an architect's drawings?
Yes. Design packages and drawings are accepted for pricing. Send them through the quote form or by email to info@loudsigns.us.
When should signage be planned during a tenant improvement?
Start while the wall layouts, electrical rough-in and landlord drawings are still open for coordination. Final graphics can follow later, but backing, cable routes and access may depend on the sign type. Put artwork approval, site measurement and installation on the same schedule as the fit-out.
Why are two quotes for the same sign different?
One price may cover the fabricated sign at the shop while the other includes a survey, removal, lift access, installation and electrical coordination. Ask both bidders to price the same drawing revision and show inclusions and exclusions beside each item. Compare the amount required to reach a finished, working sign.
Who should remove the old sign and repair the wall?
Assign both tasks in writing. Sign removal may leave holes, mismatched paint, outlines in the cladding or unused electrical connections. Ask who will disconnect the old sign, dispose of it, weatherproof penetrations and match the finish. A photograph taken before removal helps everyone agree on the scope.
Can we use the same sign design at every branch?
Usually the brand elements can stay consistent while dimensions, mounting and lighting adapt to each site. Create a standard for the lettering, colors and acceptable layouts, then prepare a site-specific drawing for each address. Review landlord criteria, local approvals and sightlines before releasing a batch for fabrication.
What should be included in a sign handover package?
Ask for the approved artwork, final sign schedule, finish references, care instructions, warranty terms and service contact. For illuminated signs, include the driver location and component details. For a multi-site rollout, add labeled daytime and evening photos so the next location has a clear acceptance reference.